Buyer Docs

Hardware Specs

Hardware Spec Quick Reference (Pre-Sale)

Dimensions, weight, voltage, power draw, supported phone models, lead time, packaging, warranty, and remote setup — buyer checklist before quote.

Dimensions — standard rack: approx. 43.5 × 27.5 × 9 cm (L × W × H). Empty chassis and custom cabinets differ — final drawing in written quote.

Weight — typical net weight: 8–12 kg per standard rack (chassis + fans + PSU, phones not included). Gross carton weight on packing list after configuration.

Voltage — 110–220V AC input. Region-specific power cable supplied or noted in quote.

Power draw — industrial PSU typically 550W class for 20-node racks. Continuous draw depends on how many devices charge simultaneously — plan 200–400W class for loaded Android labs; confirm PDU sizing in quote.

Supported phone models — share your device list. Reference platforms: Samsung S8/S10/Note series, A908N-class motherboard boards, iPhone layouts per Lightning/USB-C plan. See /phone-farm Reference Device Models.

One PC, how many boxes? — one control workstation usually manages one rack (~20 nodes) through one powered USB hub uplink. Two or more racks need additional USB host controllers, hub tiers, or a second PC. See /knowledge-base/one-pc-how-many-rack-boxes.

Lead time — in-stock SKUs: 5–10 business days workshop QC + packing. Custom layout: 7–15 business days. International express +3–7 days; sea freight 15–30 days.

Packaging — foam-lined export cartons, accessory checklist, slot wiring map inside carton. Orders of 5+ racks may ship on pallet. Custom cabinets: crated sea freight typical.

Warranty — 12-month hardware support on chassis, fans, and PSU modules from shipment date. Buyer-supplied phones and third-party software excluded.

If something breaks — contact sales with order reference, photos, and slot map. Fan modules, USB cables, PSUs, and hubs are replaceable. Remote diagnostics via WhatsApp or Telegram.

Photos before shipment — bulk (5+ units), enterprise packages, and custom projects include packing inspection photos on request. Sample orders: ask sales on WhatsApp before dispatch.

Remote installation — Remote Control Setup is remote ADB/workstation commissioning (2–4 hours typical), not on-site physical rack installation. On-site integration is quoted per project only.

Full FAQ: /faq · Device compatibility KB: /knowledge-base/supported-device-compatibility

Ready to Place an Order?

Shop the catalog, register to order. USDT payment after order confirmation. Bulk quotes via Guangzhou, China sales — contact panel bottom-right: Telegram, WhatsApp, or email.